Metro Water Renewals
Project goal:
Replacing water reticulation mains across the Perth metropolitan area.
Status:
In construction.
Delivery Date:
Late 2024.
Construction is due to begin late 2024. The tables below will be updated with expected construction dates.
In July, we will begin preparation work in the below areas, to determine the exact location of underground services such as gas, electricity, telecommunications and drains.
Noise and dust
Noise and dust will be kept to a minimum however, construction will involve road cutting, excavating and compacting.
Traffic management
Traffic management will be in place to ensure the safety of our crew and your community.
Access
The new pipe will be installed in the road verge. Access will be interrupted for up to a day while we are completing the section of pipe directly out the front of each property. We will contact you ahead of time to organise access requirements for your property.
Reinstatement of verges and driveways
A temporary reinstatement of your driveway and road will be completed the same day and a permanent reinstatement upon completion of your street.
Please be assured that any affected area, including verges and driveways, will be reinstated as closely as possible to its condition prior to the work.
Water outage
There may be a temporary water supply interruption to your property during the work. We will contact you directly if your property is affected.
Connection pipe
As well as replacing the water pipe along this street, we may also be required to replace your connection pipe. This pipe runs between the new water pipe and your water meter. We will notify you ahead of time if we will renew your connection pipe.
We follow a thorough reinstatement process to ensure all impacted areas are replaced like for like, where practically possible. We work closely with the Local Government and residents to ensure all reinstatements are carried out to an acceptable and high standard.
We thank you for your patience and appreciate your cooperation while this necessary work is carried out.
Street | Suburb | Timing |
Pine Tree Lane | Mount Claremont | November 2024 |
Street | Suburb | Timing |
Myaree Way | Duncraig | October 2024 |
Cook Ave | Hillarys | November 2024 |
Iolanthe Drive | Duncraig | October 2024 |
Street | Suburb | Timing |
Beechboro Road South | Bayswater | November/December 2024 |
Constance Street | Bayswater | September 2024 |
Katanning Street | Bayswater | September 2024 |
Jacqueline Street | Bayswater | September 2024 |
Hardy Street | Bayswater | October 2024 |
Street | Suburb | Timing |
Kooyong Road | Rivervale | September until November 2024 |
Central Ave | Redcliffe | October until November 2024 |
Street | Suburb | Timing |
Banksia Street | Tuart Hill | October 2024 |
French Street | Tuart Hill | October/November 2024 |
Edna Street | Tuart Hill | September 2024 |
Haig Street | Tuart Hill | September 2024 |
Hodgson Street | Tuart Hill | November 2024 |
Federal Street | Tuart Hill | November 2024 |
Park Street | Tuart Hill | November/December 2024 |
Milford Way | Nollamara | November 2024 |
St Albans Road | Nollamara | December 2024 |
Ravenswood Drive | Nollamara | December 2024/January 2025 |
Harrison Street | Nollamara | December 2024/January 2025 |
Barnes Street | Innaloo | January 2025 |
Metro Water Renewals Enquiries
Related Documents
- City of Belmont Central Ave Start of work notification Oct 2024 PDF 256KB
- City of Bayswater Katanning Constance Jacqueline Hardy Start of work notification Aug 2024 PDF 193KB
- City of Belmont Kooyong Start of work notification Aug 2024 PDF 169KB
- City of Stirling Edna and Haig Start of work notification Aug 2024 PDF 191KB